90 HEATING ROOM AS A CONTAINER FOR THE LOGISTICS CENTRE IN DENKENDORF

Area of responsibility: Planning and site management.

geheit_DRUCKLUFTZENTRALE, ANBINDUNG DER AKA UND KÄLTETROCKNER

COMPRESSED AIR SYSTEM, CONNECTION OF ACTIVE CARBON ADSORBERS AND REFRIGERATION DRYERS - DN 100-150 STAINLESS STEEL LINES

Area of responsibility: planning and realization.
geheit_DRUCKLUFTZENTRALE, ANBINDUNG DER AKA UND KÄLTETROCKNER

wp826a2a60_05_06

HEAT RECOVERY UNIT IN SWITZERLAND. STORAGE HALL HEATING WITH THE WASTE HEAT AFTER THE COMPRESSION.

Monovalent heat emission with two сompressors for air pressurization with water injection.

Area of responsibility: planning and realization.

1.5 MEGAWATT RECOOLING SYSTEM FOR COMPRESSED AIR AND VAUKUUM TECHNOLOGY

Area of responsibility: planning and site supervision.

ENERGY EFFICIENCY ANALYSIS AT THE COMPRESSED AIR STATION (KAZAKHSTAN)

Renewal of compressor and transformer station
Air capacity 25.200 m³/h
Total electrical power consumption: 3.2 MW
Dew point – 40°C
Responsibilities: project management, planning and consulting.